Question 19
Question:
Question 19
Can the limits with the water channels within the competition site be modified in both levels, +1m and +5m?
Answer:
The height of the ship canals, shown in the competition board, can be modified in some points to build specific docks and facilities for boat storage, always maintaining the overall area of water as indicated in the attachments 7 and 8. The proposal of new canals and/or a secondary canal system, integrated into the architecture project, is allowed.